Thanks bears for coming to the re opening of the 4th and 5th floors.
Moffitt library 4th floor.
Moffitt floors 4 5 accessed through the east entrance are open 24 hours during the fall and spring semester and are snack and drink friendly.
Please enter on the third floor of moffitt next week to access all levels.
Best of luck on finishing up finals bears.
Reservable technology rooms on moffitt floor 4 van houten presentation studio room 415 8 10 seats.
This includes the fourth floor entrance to moffitt library.
Moffitt 5th floor construction.
The moffitt fourth floor terrace will be closed during the week of march 27 31.
The terrace will be closed as part of the terrace remodeling project.
Shining a light on library reinvention tech friendly spaces support modern teaching and learning.
We got a look inside moffitt library s redesigned fourth and fifth floors before and after students were granted access for the first time.
Time lapse film of the renovation progress on the 4th floor of moffitt library at the university of california berkeley from march to may 2016.
The university library began re envisioning moffitt library with the renovation of floors 4 and 5 in 2016 transforming them into a flexible 24 hour environment for individual and group study.
The moffitt fourth floor terrace will be closed during the week of march 27 31.
Please enter on the third floor of moffitt next week to access all levels.
This includes the fourth floor entrance to moffitt library.
Equipment for recording an individual or group presentation to save on a usb drive.
Keeping with the university s innovative character moffitt library s newly renovated fourth and fifth floors have been transformed into distinctive places for learning for collaborative participatory studying and for concentration and focus.
Moffitt library will reopen 4th 5th floors in early november the daily californian the wait is almost over the fourth and fifth floors of moffitt library will reopen to students in early.
The terrace will be closed as part of the terrace remodeling project.
The new study space officially opened wednesday and.